Backyard accessory dwelling unit with a tiled roof, illuminated windows and a garden pond
Yelp Reviews
4.5/5 Rating
Google Reviews
4.9/5 Rating
Facebook Reviews
5/5 Rating
Angies List Reviews
5/5 Rating
Houzz Reviews
5/5 Rating
GuildQuality Reviews
4.8/5 Rating

Kirkland permits up to two accessory dwelling units on many residential lots, subject to the city's development standards and shoreline restrictions. New Day Construction is a general contractor with a Kirkland office at 15021 116th Pl NE, and we design and build ADUs and DADUs for homeowners in Kirkland and across the greater Seattle area. Call (425) 584-2936 or request a free estimate, and we will look at your lot before we talk about floor plans.

A Trusted ADU Builder in Kirkland, WA

An accessory dwelling unit is a second, fully independent home on your lot. It can be a backyard cottage, a garage conversion, a basement apartment, or an attached suite, and a detached ADU is what builders call a DADU. Many Kirkland homeowners build one for aging parents, a grown kid, a home office, or rental income. Others simply want flexible living space they can reassign as the family changes.

Kirkland's ADU regulations generally allow two attached or detached units per lot, up to 1,200 sq ft each. Setbacks, lot coverage and floor area requirements still apply. Lots in the Residential-L shoreline environment are limited to one ADU; we check the rules for your address before choosing a layout.

About New Day Construction

We have 21+ years of combined team experience in residential construction, and ADU work is part of it. In our September 2026 project interview, our team described a completed garage-to-ADU conversion and a 1,200 sq. ft. detached DADU under construction in Lynnwood. We also handle basement conversions. As a general contractor, we coordinate the project from the first site visit to the final inspection and bring in subcontractors for trades such as plumbing and electrical.

Our ADU Builder Services

Here is what we handle on an ADU project, in the order it happens.

  • Design. Layouts and 3D renderings tied to what can actually be built on your lot, with a custom ADU design that suits your existing home.
  • Permits. We coordinate the plans and documents, city submissions and inspections required for the agreed scope.
  • Site work. Excavation and foundation work run through our subcontractors, and we coordinate them.
  • Construction. Our crew builds the unit, including a full kitchen and bath, with plumbing and electrical done by subcontractors.
  • Project management. A project manager keeps you updated from start to finish.
  • Final review. We walk the finished unit with you and stay reachable for follow-up questions.

Why Choose New Day Construction as Your Local ADU Builder?

Here is why Kirkland homeowners hire us for an ADU.

Budget and schedule planning. Our goal is to deliver the agreed scope on budget and on time. Added work, concealed conditions and approval delays can affect both; we discuss changes and document their cost and schedule impact before proceeding.

Pricing from today's market. For ADUs and other large builds we collect current bids from our subcontractors before we write the estimate, rather than relying on an old pricing template.

A written scope. You see what the price covers before work starts, and clear communication continues through every phase.

Written warranty terms. Ask us to explain the workmanship coverage and exclusions in your project agreement before signing. Manufacturer warranties on installed materials have their own terms; they are not a substitute for the agreed construction warranty.

Our ADU Builder Team near Kirkland

Design, permit coordination, and project management sit with us as your general contractor. Our project managers lead jobs of every size, so a small ADU gets the same attention as a large addition.

Top-Rated ADU Builder Near Kirkland

Our Kirkland office, Bellevue showroom and offices in Lake Stevens and Mukilteo support work across King County and Snohomish County. Lots near Lake Washington can add another layer of review: projects near lakes, streams, steep slopes or wetlands may require additional site-specific studies or approvals. We discuss those conditions during the initial review, whether you are considering a detached ADU or an attached ADU.

Understanding the Different Types of ADU Builders

Not every ADU builder works the same way, so match the builder to your lot and your goals.

General Contractors

A general contractor, like New Day, runs the whole project and hires the trades. That suits a homeowner who wants one point of contact.

Design-Build Firms

These firms keep architecture and construction under one contract. Ask whether permits and engineering are included in the price.

Prefab and Modular Builders

A factory builds the unit, and a crew sets it on your site. You still need a foundation and utility connections, as well as city approval, so ask who handles each one.

Specialty Conversion Builders

Some builders only do garage or basement conversions. That depth helps when your project is exactly that and limits you when it is not.

Why Kirkland Homeowners Build ADUs

An ADU can generate rental income without selling or moving. It can house family members such as aging parents, and a home office or guest suite frees up the main house. It can also increase property value because it adds livable area, though the amount depends on the appraisal and neither rent nor resale returns are guaranteed. Each new unit also adds to the supply of smaller homes.

Contact Us Today for a Professional ADU Builder

Call (425) 584-2936 or request a free estimate. Tell us your address, intended use and preferred ADU type so we can review the next steps for your Kirkland property.

Serviced ZIP Codes: 98004, 98005, 98006, 98007, 98008, 98009, 98015

Why Choose New Day Construction?

Premier Remodeling, Custom Homes & ADU Building in Bellevue

  • Free, No-Pressure Estimates

    Clear, upfront pricing with zero hidden costs.

  • 21+ Years of Experience

    Local craftsmanship trusted for decades.

  • Top-Quality Materials

    Designed for beauty, built for lasting durability.

  • Fully Licensed & Insured

    Confidence and protection every step of the way.

  • Clean, Respectful Crews

    We treat your home like it’s our own.

Speak to an expert today!

Free estimates, clear straightforward pricing

Get Pricing
Special Offer

$1500 OFF

Your Dream Kitchen or
Bathroom Transformation

Claim Your Discount →

*Offer expires November 30, 2026

Wood double-sink bathroom vanity with a white countertop and two round mirrors

About Us

Contact Us

Office: (425) 584-2936

1850 130th Ave NE #1 ,
Bellevue, WA 98005

Frequently Asked Questions about Adu Builder in Kirkland

How much does it cost to build an ADU in Kirkland, WA?

We price every ADU after a site visit, since a garage conversion and a two-story detached unit have little in common. For large builds we collect current bids from our subcontractors first. As a historical Seattle reference, New Image's October 2025 guide lists garage conversions at $180,000 to $250,000 and detached cottages starting around $300,000, with a general range of $350 to $500 per sq. ft. Those are another company's published figures, not a New Day quote or a current Kirkland price guarantee.

Is it more cost-effective to add onto an existing home or build a new ADU?

It depends on the lot and the goal, so we price the options side by side. A garage or basement conversion reuses an existing shell, an addition shares your home's roof and utilities, and a new detached unit gives full separation. If renting matters most, a separate entrance and a compliant independent dwelling can be important deciding factors.

What are the size limitations for an ADU in Kirkland, WA?

City regulations generally cap each ADU at 1,200 sq ft. The Planning Director may approve additional floor area for a single-floor attached unit within an existing home. The Residential-L shoreline exception allows only one ADU. Confirm your site's setbacks and other development limits with the city before finalizing plans. These rules were checked on October 9, 2026.

What are the drawbacks or challenges of building an ADU?

Cost and permit timing are common challenges. Site access, utility connections and concealed conditions in a conversion can also affect the scope. Properties near lakes, streams, slopes or wetlands may need additional review. We discuss a property-specific schedule rather than applying home-addition timelines to every ADU. If you stay on site during construction, plan around noise and access; if you rent the unit, you also take on landlord responsibilities.

What permits and regulations are required to build an ADU in Kirkland, WA?

The permit package depends on your design and site. Plans, site information and the applicable building and trade approvals must be coordinated before work begins. The city's ADU planning guidance is a starting point, and Kirkland Planning at 425-587-3600 can confirm requirements for your address. We coordinate documents and inspections for the agreed project scope.

What types of ADUs can be built in Kirkland, WA?

Options include a detached DADU or backyard cottage, a garage conversion, a basement conversion and an attached suite, where the property and design meet city requirements. New Day handles detached DADUs, garage and basement conversions, and mother-in-law-style attached units.

What is the process for building an ADU in Kirkland, WA?

It starts with a free estimate and a site review of zoning and access. Design comes next, then engineering where needed and permit submission. In our September 2026 interview, the team described design taking about 1 to 3 months and structural engineering about 2 more on some larger projects; these are examples, not a promised ADU schedule. Construction follows approval, with inspections along the way and a final walkthrough.

Can I rent out my ADU in Kirkland, WA, including for short-term rentals?

Rental use must meet the applicable licensing and city rules. Kirkland's short-term rental guidance requires Washington State and city business licenses. For stays under 30 days, continuous owner or authorized-agent residence allows no annual day cap, with at most two rentals at once. Otherwise, residence for at least 245 days a year is required and the cap is 120 rental days; without a primary resident, short-term rentals are not allowed. When absent, identify a property manager within 15 miles. Lodging taxes may apply. Confirm eligibility for your address before advertising; these rules were checked on October 9, 2026.

What are the benefits of building an ADU in Kirkland, WA?

An ADU can generate rental income, house family members such as aging parents, and serve as a home office. It adds flexible living space that changes with your household and may increase property value, depending on the market and appraisal. It also adds to the local supply of smaller homes.

Backyard accessory dwelling unit with a tiled roof, illuminated windows and a garden pond

Kickstart Your Project with Kirkland ADU Builder Today!

Start your journey to a perfect ADU in Kirkland with us. Reach out to Kirkland ADU Builder now!

Get Started
Areas Served

© 2026 New Day Construction, LLC. All Rights Reserved.Full-Service Remodeling Experts in Bellevue. New Day Construction rated 5 / 5 based on 150 reviews.

Privacy PolicyContact Us